October’s Haydon Happenings
Project Name: Swan Pond Road Deck Pour Check out some sights (video above) from our recent deck pour at the Swan Pond Road Bridge! This deck took around 830 Cubic Yards of concrete and was poured in two phases. We poured these starting at 3 AM to avoid traffic and hotter daytime temperatures! Huge thanks…