Efficiency with a Drum Cutter Excavator
Haydon Bridge is always on the lookout for ways to reduce waste and improve efficiency. In this video, we are performing solid rock excavation for a pier footer using a drum cutter excavator attachment.
Haydon Bridge is always on the lookout for ways to reduce waste and improve efficiency. In this video, we are performing solid rock excavation for a pier footer using a drum cutter excavator attachment.
First, What is a Cofferdam? According to Dictionary.com: cof·fer·dam /ˈkôfərˌdam,ˈkäfərˌdam/ noun – a watertight enclosure pumped dry to permit construction work below the waterline, as when building bridges or repairing a ship. “The history of the cofferdams goes back to at least the ancient Roman engineers, who built a number of these enclosures to found…
DetailsHaydon Bridge Construction offers Design-Build services, which is a mode of procurement that we utilize to provide each project with the best value regarding process, materials and skilled labor, rather than making decisions solely based on cost. Design-Build is defined as a method of project delivery in which one team works under a single contract…
DetailsHaydon Bridge is proud to say that we were able to complete the 1st Emergency Bridge Replacement in Perry Co., KY. We would like to thank the Haydon Bridge Team Members who contributed to this milestone achievement. The recovery effort in Eastern KY would not be possible without collaboration between the KYTC, KY Bridge Program…
DetailsThe past, present and future of Haydon Bridge Company – about the new owners, their vision for the company, and how they will continue to implement the core values of our 50 year old business.
DetailsWe appreciate the KYTC showing some our hard-working folks who are in Eastern KY helping repair bridges damaged from the flooding that took place earlier this summer. Several of those employees have been onsite helping restore access to those who lost bridges since early August. Repairing bridges and building diversions (temporary crossings) has been a…
DetailsHaydon Bridge was excited to participate in the Groundbreaking Ceremony of the latest section of the Mountain Parkway Expansion in Wolfe Co., KY with Governor Andy Beshear, Transportation Secretary Jim Gray, Rocky Adkins and many other stakeholders. Thanks to Bizzack Construction for the relying on HBC to construct the Bridge and Culverts on this project…
DetailsSeptember 1, 2018 – Kevin Wolfe has been named Vice President of Construction.